Drainage and structure
Choose soil that is easy to work and drains well. Raised beds can help where water remains after rain.
Commercial cultivation
Start with well-drained soil, healthy bulbs and a planting plan that suits your climate, land and available labour.
Before planting
Saffron grows in different soil types, but waterlogging and poor soil preparation increase the risk of problems. Check drainage and soil condition before choosing the planting layout.
Choose soil that is easy to work and drains well. Raised beds can help where water remains after rain.
Prefer land where Crocus or other iris-family crops have not been grown recently, to reduce soil-borne disease pressure.
Base soil preparation and fertiliser use on a soil analysis, field conditions and the number of years you plan to keep the crop.
Planting system
These figures are a starting point for a common bed system managed by hand. Machinery, soil and drainage may call for a different layout.
Plant bulbs upright with the growing point facing up. In the Northern Hemisphere, planting is usually in late summer before autumn flowering. Discuss the right delivery dates for your climate.
Annual growth cycle
Flowering is only a short part of the growing cycle. The leaves stay active through winter and spring while new daughter bulbs develop underground.
June — September
Mature bulbs rest during summer before planting and root growth begin.
October — November
Flowers open over a short period and are picked for their red stigmas.
Winter
The narrow, grass-like leaves stay green and support further growth when conditions are suitable.
March — June
The new bulbs grow and mature during spring.
Late spring
The leaves turn yellow and die back as the new bulbs finish developing.
June onward
Depending on the growing system and climate, bulbs are lifted and sorted or left in the ground for another season.
Crop management
Avoid unnecessary irrigation during summer dormancy. Monitor soil moisture after rooting and during dry spring weather.
Keep weeds under control throughout the growing cycle, especially while the leaves are actively growing.
Use soil tests and crop observations to decide what fertiliser is needed, rather than following the same programme on every field.
Check the risk of damage from grazing animals and rodents, and arrange suitable physical protection for the field.
The saffron harvest
Flowering usually lasts a few weeks in autumn. Arrange enough people, clean working space and drying capacity before the first flowers open.
Collect newly opened flowers carefully and move them out of the field without unnecessary delay.
Remove the three red stigmas from each flower and separate the pale lower part according to the intended quality standard.
Dry the stigmas on the day of harvest using a controlled method. After conditioning, store them in airtight containers in a cool, dry, dark place.
Multi-year cultivation
Each bulb produces daughter bulbs. As the planting becomes more crowded, the bulbs have less room to reach the larger sizes that flower more heavily.
When to lift depends on summer soil temperatures, climate, disease pressure and your growing plans. Plan lifting and rotation before you plant the first crop.
Cultivation questions
Not everywhere. Raised beds are useful where water drains slowly or remains after rain. On freely draining soil, flat beds may be suitable.
In the Northern Hemisphere, mid-August to late September is a usual planting period. Local summer temperatures and delivery dates can affect the schedule.
Bulbs in summer dormancy generally do not need irrigation. Check moisture after root growth starts and during dry periods when leaves and daughter bulbs are actively growing.
There is no fixed interval for every climate. In areas with warm summers, bulbs may stay in the ground for several years. Cooler conditions may call for earlier lifting. Keep track of flowering, planting density, bulb growth and crop health.
Plan before ordering
Tell us your location, planting area, soil type, growing method and preferred bulb sizes. We can help with quantities and delivery planning.